PROJECT DESCRIPTION

Our company has been closely associated with the construction of the marina- we have created a spatial plan, a design project (by cooperating with other companies) and a 3D visualization for it.
The design part was created as a result of cooperation of different companies and our part in it was to design a pier and a dock. Today the marina is constructed and open for visitours.

Spatial plan
  • a pier
  • marina building, parking area and utility network
  • a gas station for vessels
Desgin project
  • deepening the aquatorium
  • fortification of the river bank
  • 40 m long stationary pier for up to three boats
  • a floating pier for up to 44 boats
Visualization
  • marina area
COMPILERS
Urmas Nugin, Raul Tihane, Terko Veensalu and others
Jaga sotsiaalmeedias: